Every gate includes the right to stop. That's why the work moves fast.

DTP delivery runs through five evidence gates: Discover, Prove, Build, Pilot, Launch. Each one buys information before anything costs scale, and stopping at any of them is a result, not a failure.

Progress is earned by evidence, not optimism.

Each gate buys information before it costs scale. The gate is passed when the evidence is strong enough, and closed without shame when it isn't.

01

Is the problem clear enough to deserve money?

Discover

Give every idea a route, and every stage the guardrails it requires.

Understand users, workflow, data, systems, risk, ownership and the business decision the work must improve.

Evidence gate

Current-state map, constraints, success criteria and recommended first route.

02

Is the value real outside a slide?

Prove

Test the smallest convincing version of value.

Create a focused PoC around one workflow, data path, decision surface, agent behaviour or integration risk.

Evidence gate

Evidence of feasibility, value, limits and what must be true before MVP.

03

Can real users touch it without it breaking?

Build

Turn the proven core into something real users can touch.

Build an MVP with usable interfaces, real data pathways, controls, support assumptions and delivery-grade architecture.

Evidence gate

Working MVP, measured behaviours, operational feedback and launch-readiness gaps.

04

Does it survive actual operations?

Pilot

Run safely inside a controlled operational setting.

Test with users, measure adoption, expose edge cases, refine controls and decide whether the system should scale.

Evidence gate

Pilot findings, adoption signals, risk updates and scale/no-scale recommendation.

05

Who owns it when it's live?

Launch

Scale the system with ownership, monitoring and improvement cycles.

Move into live use with support, documentation, monitoring, feedback loops and a clear improvement backlog.

Evidence gate

Live system, handover, monitoring model and next improvement route.

Controls are part of the build, not decoration at the end.

The process works because governance, adoption and technical reality are handled while the system is being shaped.

Human approval loops where decisions carry risk.

Permissions and data boundaries defined before scale.

Operational support model agreed before launch.

Measurement tied to effort, visibility, speed or safety.

We publish the method because the method isn't the moat. Judgement is.

Not every idea needs a build. Every serious idea needs a responsible next gate.